




Thanks to the developments, the water sources, waterworks, and drinking water supply network will be renewed and expanded. The water tower will be renovated, and the supply network will be expanded, increasing supply security and the quality of service.
After the developments, the existing wastewater treatment plant and its connected network will be suitable for handling the wastewater treatment needs of a city with nearly 300,000 residents, including surrounding settlements and developed industrial zones, in a cost-effective manner. The development will not only connect the eastern and southern parts of Debrecen to the existing network but will also address the wastewater management of industrial parks. The capacity of the wastewater treatment plant will be significantly increased, and the reception and treatment of industrial wastewater will also be feasible.
Protection of groundwater and the reuse of treated wastewater.
Greywater, a mixture of surface water as diluting water and treated wastewater, can be used by factories in the two economic zones during their technological processes, thereby significantly reducing the consumption of drinking water.
A Déli Gazdasági Övezetre irányuló számottevő befektetői érdeklődés és a betelepülő beruházásokkal a területen ugrásszerűen növekvő beépítettségi arány az ipari parkban 2016-tól ütemezetten kiépített belső csapadékvíz-elvezető hálózat bővítését, ill. a meglévő természetes befogadók fejlesztését tette szükségessé(Kisgugyori-csatorna, Kondoros-csatorna, Tócó-csatorna, Kösely-csatorna).

Drinking water

Sewage

Grey water

Csapadékvíz